About us
cubic yard calculator is a free set of 51 calculators for one job: turning the numbers on your tape measure into the numbers on your order.
Why this site exists
Most projects with concrete, gravel, sand or soil go wrong at the same moment: the order. Order too little concrete and the truck leaves with half a slab poured. Order too much gravel and a pile sits on the driveway for a month.
The math isn't hard. The units are. You measure in feet and inches. The landscape yard sells by the cubic yard. The quarry sells by the ton. The store sells bags of 0.5, 2 or 3 cubic feet. The trailer is rated in pounds. A supplier abroad quotes cubic meters, and one in India quotes brass.
We built these calculators to close that gap. You type what you measured. You get what you order, in the unit your supplier uses, with the math shown so you can check it.
Who builds the calculators
Ali Saqlain founded calculatecubicyards.com and builds every calculator on it. Ali is an electronics engineer. Engineering work comes down to the same habit this site needs: write the formula, check the units, and test the result against a case you can work by hand.
Ali writes each formula, checks the worked example on every page against the calculator's result, and builds the conversion charts from the same formulas, so tables and tools always agree. Readers' corrections go straight to him at contact@calculatecubicyards.com. The full method is on the How we calculate page.
How the tools help, from tape measure to delivery
The 51 calculators follow the 5 steps of a material job:
Each calculator draws your project as you type: a slab with its forms, a driveway with 3 stone layers, a fish tank with its sand bed, a riverbank lined with rip rap. A wrong number shows up as a wrong picture, so you catch typos before you pay for them.
Who uses it
2 raised beds of 4 × 8 ft filled 12 inches deep need 64 cubic feet of soil. The raised bed soil calculator says that's 2.37 cubic yards, or 43 bags of 1.5 cu ft, so you can compare bags against one bulk delivery.
A 40 × 12 ft pad with 6 inches of compacted road base needs 10.7 loose cubic yards with 20% compaction, about 15.5 tons. The road base calculator gives the tons the quarry asks for.
A 16 × 32 ft pool dig with 2 ft over-dig moves 126.7 bank cubic yards, 158 loose yards and 16 truckloads. The excavation and loader bucket calculators turn that into trucks and scoops for the bid.
Students and DIYers use the conversion pages to learn the formulas. A 10 × 10 ft slab 4 inches thick is 1.23 cubic yards, or 56 bags of 80 lb concrete, and the concrete calculator shows each step of that math.
How we keep the numbers honest
- Formulas are on every page, with a "With your numbers" line that repeats the math using your inputs.
- Weights are typical values with ranges, such as 2,800 lb per cubic yard for gravel and 2,200 lb for topsoil. Change the material and the result changes with it.
- Units come in pairs. Results show US units next to metric: cubic yards and cubic meters, tons and tonnes, inches and centimeters.
- Results are estimates. Moisture, rock type and site conditions change real quantities, so check large orders with your supplier.
What it costs
Nothing. There is no account, no sign-up and no paywall. The calculators run in your browser, and what you type stays on your device. The privacy policy explains this in full.
All 51 calculators
Start with the cubic yard calculator for any material and shape, or pick a calculator built for the job:
Concrete & Asphalt
Gravel & Stone
Sand
Soil, Compost & Mulch
Shapes
Conversions
Contact
Found a wrong number or want a calculator we don't have? Use the contact form or email contact@calculatecubicyards.com. Include the page and the numbers you entered, so we can check the result. More ways to help are on the contact page.