cubic yard calculator

Driveway gravel calculator

Enter the driveway length, width and the depth of each layer to calculate gravel for a driveway. Cubic yards per layer = length (ft) × width (ft) × layer depth (in) ÷ 324. A gravel driveway is built from 3 layers: large base stone, medium stone and a top surface layer.

Gravel driveway layers
Live preview
You need
0

How driveway gravel calculator works?

The driveway gravel calculator works in 3 steps: it finds the driveway area, multiplies by the depth of each of the 3 layers, and adds the compaction allowance. Each layer gets its own weight: #3 stone 1.45 t/yd³, #57 stone 1.4 t/yd³ and crusher run 1.5 t/yd³.

YOU ENTERCALCULATOR DOESYOU GETDriveway lengthDriveway widthBase layer (#3 stone)Middle layer (#57 stone)Top layer (crusher run / #411)Extra for compactionArea × each layer depth ÷ 324× (1 + compaction %)Total cubic yardsBase layer yd³ + tonsMiddle layer yd³ + tonsTop layer yd³ + tons
  1. Enter the driveway length and width.
  2. Enter the depth of the base, middle and top layers.
  3. Set the compaction allowance, 15% for most driveways.
  4. Order each layer by the yards or tons shown.

Driveway gravel formula

The driveway gravel formula is cubic yards per layer = length × width × layer depth (in) ÷ 324, summed over the 3 layers.

Each layeryd³ = L × W × layer depth (in) ÷ 324 × (1 + compaction)Tons per layertons = yd³ × layer weight (1.4–1.5)Totalyd³ total = base + middle + top
With your numbers
—

Driveway gravel conversion chart

The driveway gravel conversion chart lists cubic yards and tons for 12 ft (3.7 m) wide driveways of common lengths, with 4 + 4 + 3 inch layers and 15% compaction.

Driveway (12 ft wide)Base yd³Middle yd³Top yd³Total yd³Total tons
25 ft (7.6 m)4.264.263.1911.7116.9
50 ft (15.2 m)8.528.526.3923.4333.9
100 ft (30.5 m)17.0417.0412.7846.8567.7
200 ft (61.0 m)34.0734.0725.5693.70135.4
Total driveway gravel by driveway length25 ft11.7 yd³50 ft23.4 yd³100 ft46.9 yd³200 ft93.7 yd³
Next step

Price the job with the gravel driveway cost calculator, and count trips with the dump trailer calculator if you haul it yourself.

How to Calculate Gravel for a Driveway

To calculate gravel for a driveway, work out each layer separately: length × width × layer depth in inches ÷ 324. There are 3 layers in a standard gravel driveway:

  1. Base layer: #3 stone (1.5–2.5 in / 4–6 cm) laid 4 inches (10 cm) deep.
  2. Middle layer: #57 stone (3/4–1 in / 2–2.5 cm) laid 4 inches (10 cm) deep.
  3. Top layer: crusher run or #411 laid 2–4 inches (5–10 cm) deep and compacted.

A 50 × 12 ft driveway with 4 + 4 + 3 inch layers needs about 23.4 cubic yards (17.9 m³) of driveway gravel with 15% extra, roughly 34 tons.

Gravel Driveway Depth Guide

Driveway useTotal depthYd³ per 100 ft of 12 ft driveway
Light cars, firm soil8 in (20 cm)29.6
Everyday cars and vans11 in (28 cm)40.7
Trucks, soft or clay soil12–15 in (30–38 cm)44–56

Frequently Asked Questions

How much gravel do I need for a driveway?

A gravel driveway needs about 0.34 cubic yards per 10 square feet at 11 inches total depth. A 50 × 12 ft driveway at that depth needs about 20 cubic yards before the extra for compaction.

What is the best gravel for a driveway?

The best driveway gravel is a 3-layer build of #3 stone, #57 stone and crusher run. Crushed, angular stone locks together and stays in place better than round pea gravel.

How thick should driveway gravel be?

Driveway gravel should be 8–12 inches (20–30 cm) thick in total, laid and compacted in 3–4 inch layers.

How many tons of gravel for a 100 ft driveway?

A 100 × 12 ft driveway with 11 inches of layered gravel needs about 68 tons with 15% compaction.

Can I use one gravel size for a driveway?

Yes, a single layer of crusher run 6–8 inches (15–20 cm) deep works on firm soil. Layered stone lasts longer on soft or wet ground.

Do I need fabric under a gravel driveway?

Yes, woven geotextile fabric under a gravel driveway stops stone from sinking into soft soil, so the gravel layers stay at full depth.

Related Calculators