Enter the bank length, slope length and layer thickness to calculate rip rap in cubic yards and tons. Rip rap cubic yards = bank length × slope length × thickness (ft) ÷ 27. Lay rip rap at least 1.5–2 times as thick as the median rock size (D50).

Rip rap on a bank, cross-section
Live preview
You need
0

How rip rap calculator works?

The rip rap calculator works in 3 steps: it sets the layer thickness at 2 times the D50 rock size, multiplies bank length × slope length × thickness for cubic feet, and divides by 27 for cubic yards and multiplies by 1.4 for tons.

YOU ENTERCALCULATOR DOESYOU GETBank lengthSlope length (top to toe)Rock class (D50)Layer thicknessBank × slope × thickness ÷ 27× 1.4 t per yd³Cubic yardsTonsFace areaThickness × D50
  1. Enter the bank length along the shore.
  2. Enter the slope length from top to toe.
  3. Pick the rock class (D50); the thickness sets to 2 × D50.
  4. Read the yards and tons.

Rip rap formula

The rip rap formula is cubic yards = bank length × slope length × thickness ÷ 27.

Cubic yardsyd³ = bank length × slope length × T (ft) ÷ 27ThicknessT ≥ 1.5–2 × D50Tonstons = yd³ × 1.4
With your numbers
—

Rip rap conversion chart

The rip rap conversion chart gives cubic yards and tons per 100 feet of bank with a 10 ft slope, by rock class.

D50 sizeThicknessyd³ per 100 ftTons per 100 ft
6 in (15.2 cm)12 in37.051.9
9 in (22.9 cm)18 in55.677.8
12 in (30.5 cm)24 in74.1103.7
18 in (45.7 cm)36 in111.1155.6
24 in (61.0 cm)48 in148.1207.4
Tons of rip rap per 100 ft of bank (10 ft slope)D50 6 in52 tD50 9 in78 tD50 12 in104 tD50 18 in156 tD50 24 in207 t
Next step

Measuring a sloped bank? The slope calculator handles 2 depths. Smaller decorative stone is in the landscape rock calculator.

How to Calculate Rip Rap

To calculate rip rap, multiply bank length × slope length × layer thickness in feet and divide by 27 for cubic yards, then multiply by 1.4 for tons. A 50 ft bank with a 12 ft slope and a 24 inch layer needs 44.4 cubic yards (34 m³), about 62 tons of rip rap.

  1. Measure the slope length from the top of the bank to the toe, along the slope.
  2. Pick the rock class (D50) for the water speed and wave action.
  3. Set the layer thickness to 1.5–2 times the D50 size.

Rip Rap Rock Classes

D50 sizeLayer thickness (2 × D50)Yd³ per 100 sq ft of bank
6 in (15 cm)12 in (30 cm)3.7
12 in (30 cm)24 in (61 cm)7.4
18 in (46 cm)36 in (91 cm)11.1
24 in (61 cm)48 in (122 cm)14.8

Rock class names (Class I, II, III) differ between state agencies. Ask your engineer or supplier for the local specification.

Frequently Asked Questions

How much does a cubic yard of rip rap weigh?

A cubic yard of placed rip rap weighs about 2,800 lb (1.4 tons / 1,270 kg), depending on rock density and the gaps between stones.

How thick should rip rap be?

Rip rap should be at least 1.5–2 times as thick as the median rock size (D50). A 12 inch D50 rip rap needs an 18–24 inch (46–61 cm) layer.

Do I need fabric under rip rap?

Yes, lay geotextile filter fabric or a gravel bedding layer under rip rap to stop soil washing out between the stones.

How do I measure the slope length for rip rap?

Measure the slope length along the ground from the top of the bank to the toe, or calculate it as √(height² + run²).

How big should rip rap rock be?

Rip rap rock size depends on water speed and wave height: 6–9 inch D50 for gentle streams and 12–24 inch D50 for fast water or wave action.

Does rip rap need a toe trench?

Yes, rip rap needs a toe trench at the bottom of the slope, filled with stone, to stop the layer from sliding.